Skip to main content
Loading…
This section is included in your selections.

All building construction and cut-and-fill projects shall conform to the following standards:

A. The standards set forth in TMC 18.80.050(A)(4)(b) and (B)(2).

B. All storm water runoff generated on the site shall as much as possible be retained on the site. Dry wells, holding ponds, trenches or other mechanisms may be utilized to accomplish this standard. As a second priority, natural drainage channels may be utilized. [Ord. 817 § 8-3H.165, 2006.]